Construction Engineering & Preparation of Detailed Fabrication Drawings, Supply (Procurement) of Steel Bulk Materials & Consumables, Fabrication, NDT, Painting & Assembly of fully functioning Pipe Rack Modules (44) Nos. with approximate total weight of 2,500 Tons
Engineering Design (Structural, HVAC, Architectural, MEP, etc…), Preparation of Detailed Fabrication Drawings, Supply (Procurement) of Steel Bulk Materials & Consumables, Fabrication, NDT, Painting, Assembly, E&I Work, Mechanical Work, Pre-Commissioning & Commissioning of SRP Module with total approximate weight of 4,500 MT