• info@dy.ae
  • +971 2 659 3333
  • Plot No. 328P R6, ICAD-2 Industrial City of Abu Dhabi, Abu Dhabi, U.A.E.

   

Piping

  • MODULES FABRICATION FOR THE HAIL SURFACE FACILITIED EPS PROJECTS

    MODULES FABRICATION FOR THE HAIL SURFACE FACILITIED EPS PROJECTS
    Main Contractor: Tecnicas Reunidas Group
    Client: ADOC Jpn.

  • FABRICATION OF PIPESPOOL FOR ASAB FULL FIELD DEVELOPMENT PROJECT

    FABRICATION OF PIPESPOOL FOR ASAB FULL FIELD DEVELOPMENT PROJECT
    Main Contractor: PETROFAC
    Client: ADCO

  • FABRICATION OF PIPESPOOL FOR ASAB FULL FIELD DEVELOPMENT PROJECT

    FABRICATION OF PIPESPOOL FOR ASAB FULL FIELD DEVELOPMENT PROJECT
    Main Contractor: PETROFAC
    Client: ADCO

  • Construction Engineering, Onshore Fabrication – Works for SARB – Package 3 (ADMA-OPCO)

    Construction Engineering, Onshore Fabrication – Works for SARB – Package 3 (ADMA-OPCO)
    Main Contractor: PETROFAC
    Client: ADMA-OPCO

  • UPPER ZAKUM 750K PROJECT P-7531

    UPPER ZAKUM 750K PROJECT P-7531
    EPC FOR SULPHATE REDUCTION PLANT (SRP) ON THE WEST ISLAND SC-01 FABRICATION, ASSEMBLY, PRE-COMMISSIONING & TESTING OF SRP MODULE

    Main Contractor: TECHNIP-FMC
    Client: ZADCO

  • TAWEELAH FUJAIRAH GAS PIPELINE PROJECT – CD3

    TAWEELAH FUJAIRAH GAS PIPELINE PROJECT – CD3
    Main Contractor: STROYTRANSGAZ
    Client: DOLPHIN