• info@dy.ae
  • +971 2 659 3333
  • Plot No. 328P R6, ICAD-2 Industrial City of Abu Dhabi, Abu Dhabi, U.A.E.

   

Site Construction & Shutdowns

  • Ruwais Refinery Expansion Project Package 7 Marine Facilities

    Ruwais Refinery Expansion Project Package 7 Marine Facilities
    Main Contractor: GS E&C
    Client: TAKREER

  • Ruwais Refinery Expansion Project Package 7 Marine Facilities

    Ruwais Refinery Expansion Project Package 7 Marine Facilities
    Main Contractor: GS E&C
    Client: TAKREER

  • Crude Flexibility Project SMPP Construction Work_PKG4

    Crude Flexibility Project SMPP Construction Work_PKG4
    Main Contractor: Samsung Engineering
    Client: ADNOC Refining

  • TAWEELAH FUJAIRAH GAS PIPELINE PROJECT – MECHANICAL WORKS CD4

    TAWEELAH FUJAIRAH GAS PIPELINE PROJECT – MECHANICAL WORKS CD4
    Main Contractor: STROYTRANSGAZ
    Client: DOLPHIN

  • TAWEELAH FUJAIRAH GAS PIPELINE PROJECT – MECHANICAL WORKS CD4

    TAWEELAH FUJAIRAH GAS PIPELINE PROJECT – MECHANICAL WORKS CD4
    Main Contractor: STROYTRANSGAZ
    Client: DOLPHIN

  • EPC Works for 3rd Boiler and 4th Boiler Feed Water Pump in EU3, BOROUGE 3

    EPC Works for 3rd Boiler and 4th Boiler Feed Water Pump in EU3, BOROUGE 3
    Main Contractor: Wison Energy Engineering (Hong Kong) limited – Abu Dhabi
    Client: Borouge

  • EPC Works for 3rd Boiler and 4th Boiler Feed Water Pump in EU3, BOROUGE 3

    EPC Works for 3rd Boiler and 4th Boiler Feed Water Pump in EU3, BOROUGE 3
    Main Contractor: Wison Energy Engineering (Hong Kong) limited – Abu Dhabi
    Client: Borouge

  • EPC Works for 3rd Boiler and 4th Boiler Feed Water Pump in EU3, BOROUGE 3

    EPC Works for 3rd Boiler and 4th Boiler Feed Water Pump in EU3, BOROUGE 3
    Main Contractor: Wison Energy Engineering (Hong Kong) limited – Abu Dhabi
    Client: Borouge

  • EPC Works for Replacement of Port Crane on Al-Hyleh Barge

    EPC Works for Replacement of Port Crane on Al-Hyleh Barge
    Main Contractor: ADMA-OPCO
    Client: ADMA-OPCO